CBT Center & Institutional Technology Solutions

Overview

Reliable CBT Infrastructure for Modern Institutions

Computer-Based Testing has become the standard for examinations across educational institutions. Setting up a CBT center requires proper network architecture, secure systems, and reliable infrastructure to avoid downtime and technical failures during exams. Our solutions ensure that examination centers operate efficiently, securely, and without interruptions.

Comprehensive CBT Center Setup

++Network Infrastructure.
++Server & System Configuration:
++Computer Lab Deployment
++Security & Monitoring
++System Testing & Optimization
We implement system monitoring and security protocols to protect examination data and ensure operational integrity and Before deployment, we thoroughly test systems to ensure they meet performance and stability requirements.

Technology Systems for Schools & Training Centers

Beyond CBT centers, Cyberxlabtech helps institutions build modern ICT infrastructure that supports teaching, administration, and digital operations. Our institutional solutions include:
++Campus network deployment
++Computer laboratory setup
++Server infrastructure deployment
++Secure internet and network management
++Digital learning system support

  • 250 functional laptops with 10% (i.e., 25) backups with the following minimum
    specifications:
    Intel Based processor: Dual core Celeron/Pentium
    Ram: 4GB Ram
    HD: SSD Preferred, 32GB minimum
    14” Screen size
    Windows 10
    10/100MB RJ45 Network Port
  •  Provision of individual cubicle with minimum length of 26 inches, breadth of 18
    inches and height of 18 inches and appropriate seat for eachsystem.

jamb

  • The laptops systems must be connected to a robust computer server with a
    capacity to carry 250 systems concurrently.
  • All the computer systems must be linked together on Cable Local Area Network
    topology (LAN). (Wireless Computer connection is not allowed)
  • Switches must be on uninterrupted power source throughout the exam
  • Adequate security and minimum of five (5) technical personnel and one network
    engineer.
  • Availability of back-up power supply (power generating set of minimum 40kva for
    a centre with 250 systems; 60kva for 350 systems and 100kva for above 350
    systems) and UPS/inverters that can carry all systems for a minimum of two (2)
    hours.
  • There must be internal toilets (inside the CBT hall).
  • The centre must be adequately fenced.
  •  Provision must be made for a holding room or reception facility e.g. canopy with
    chairs, etc.
  • The centre must not be in shared premises such as cinema hall, shopping mall or
    market. Shared offices, residential home e.t.c.
  • Availability of adequate and functional air-conditioners and lighting.
  • Provision of up-to-date Antivirus and all the systems must be virusfree.
  • Minimum of Windows 7 or higher version of windows operating system.
  • IP Camera (CCTV) is compulsory for all CBT centers (see specification below).
    DVR HIKVISION
    AHD Camera Hikvision 1080 5MP
    32 channel DVR machine
    NVR HIKVISION
    IP camera Hikvision 1080 2MP/4MP wide range
    32 channel NVR machine